Projects built with unrelenting passion

For more than 15 years Loeffler Construction has brought uncompromising advocacy to award-winning projects across the upper midwest. Specializing in supporting community-driven organizations, we’ve partnered with clients ranging from higher education to tribal communities.

UMN West Bank Skyway
Higher Education Eric Kassel Higher Education Eric Kassel

UMN West Bank Skyway

This project upgraded the exterior of the West Bank Skyway with demolition, framing, and installation of new Centria metal panels over Metro Transit’s right-of-way. The replacement of the exterior envelope addressed ongoing water infiltration issues and extended the life of this heavily used campus connection.

Read More
UMN St. Paul Campus Roof Replacements
Higher Education Eric Kassel Higher Education Eric Kassel

UMN St. Paul Campus Roof Replacements

At the heart of the University’s campus, three academic buildings, Aldermann Hall, Haecker Hall, and the Biosystems Building, received much-needed roof replacements. Each building carried its own history, stakeholder needs, and logistical challenges, requiring a thoughtful approach to planning and delivery.

Read More
UMN Pleasant Street Reconstruction
Higher Education Eric Kassel Higher Education Eric Kassel

UMN Pleasant Street Reconstruction

Pleasant Street is more than just a roadway; it is the signature gateway to the University of Minnesota’s East Bank campus. Framed by historic architecture and serving thousands of pedestrians, bicyclists, transit riders, and vehicles each day, the corridor demanded thoughtful improvements to balance safety, access, and campus character.

Read More
UMN South Church Street Reconstruction
Higher Education Eric Kassel Higher Education Eric Kassel

UMN South Church Street Reconstruction

This project involved utility upgrades and the full reconstruction of Church Street SE between Washington Avenue SE and Delaware Street SE. The corridor, though only one block long, serves as a critical transportation route for pedestrians and bicycles in the heart of the University of Minnesota campus.

Read More
Metropolitan State University Skyway Preservation
Higher Education Eric Kassel Higher Education Eric Kassel

Metropolitan State University Skyway Preservation

This project required innovative solutions to maintain safety and minimize disruption while working over an active highway. Loeffler and its dedicated trade partners designed and installed a complex scaffolding system that spanned Trunk Highway 5, supported by carefully coordinated night lane shifts to protect both crews and the traveling public.

Read More
UMN North Church Street Reconstruction
Higher Education Eric Kassel Higher Education Eric Kassel

UMN North Church Street Reconstruction

The North Church Street project rebuilt nearly two city blocks of shared-use plaza between Washington Avenue and the Church Street Parking Garage. Serving as a central pedestrian and bicycle thoroughfare, the corridor also accommodates daily delivery vehicles to surrounding campus buildings, making careful planning essential.

Read More
Cherry View Elementary Additions
K-12 Eric Kassel K-12 Eric Kassel

Cherry View Elementary Additions

To support the District’s growing student population, Loeffler partnered with the District and design team to deliver two building additions totaling 15,000 square feet. Each structure was carefully designed to blend seamlessly with the existing elementary school, maintaining architectural consistency while expanding the school’s capacity and functionality.

Read More
Lake Marion Elementary Addition
K-12 Eric Kassel K-12 Eric Kassel

Lake Marion Elementary Addition

As enrollment continued to rise across the district, the need for additional classroom space became clear. Loeffler partnered with the District and design team to deliver a 15,500-square-foot addition that expands the school’s capacity with ten new classrooms and two small group learning areas, all designed to blend seamlessly into the existing building and align with the District’s new interior standards.

Read More
Christina Huddleston Elementary Addition
K-12 Eric Kassel K-12 Eric Kassel

Christina Huddleston Elementary Addition

Loeffler Construction served the Lakeville Area School District as the Construction Manager Advisor for the Christina Huddleston Elementary Addition. This one-story, 9,365 SF addition includes four new classrooms and three spaces for collaborative learning.

Read More
Eastview Elementary School Addition
K-12 Eric Kassel K-12 Eric Kassel

Eastview Elementary School Addition

This project included a two-story, 9,000 SF addition to the south-east corner of the existing elementary school. The Lakeville Area Schools was facing an increasing student enrollment over the upcoming years, and to accommodate for this growth, added four classrooms and four breakout spaces.

Read More
McGuire Middle School Gym Addition
K-12 Eric Kassel K-12 Eric Kassel

McGuire Middle School Gym Addition

Loeffler served as Construction Manager as Adviser for the addition of a new gymnasium facility at McGuire Middle School. The completed project includes two competition-size gyms with two teaching stations, 400-person spectator seating, and an operable partition that allows the space to function as either one large venue or two independent gyms.

Read More
John F. Kennedy Elementary Addition
K-12 Eric Kassel K-12 Eric Kassel

John F. Kennedy Elementary Addition

Loeffler Construction served as Construction Manager Adviser to the Lakeville Area School District for the John F. Kennedy Elementary classroom addition. The 8,600-square-foot expansion created four new classrooms and four flexible collaboration spaces to support the District’s growing enrollment.

Read More
UMN Bridge 9
Higher Education Eric Kassel Higher Education Eric Kassel

UMN Bridge 9

The City of Minneapolis began a large-scale, multi-phased maintenance project on the historic Northern Pacific Railroad Bridge No. 9 several years ago, with completion anticipated in 2028. As part of this effort, Loeffler was entrusted in 2020 to manage a two-phase relocation and replacement of the University’s steam and condensate lines that run beneath the bridge, supplying critical utilities to the West Bank campus.

Read More
Artspace Lofts Minot
Affordable Housing Eric Kassel Affordable Housing Eric Kassel

Artspace Lofts Minot

Artspace Lofts Minot marked a major milestone for the city, becoming the first newly constructed building in downtown Minot in more than 30 years when it was completed. The four-story development provides 34 live-work artist studios along with first-floor retail, creating a vibrant hub for both residents and the community. 

Read More

Watch what we’re up to

Our latest projects unfold in real time through the lens of our jobsite webcams.

Explore Project Webcams

Projects in motion

Get an inside look at the collaboration, detail, and integrity in every project through our project update videos.

Explore Project Videos

Put our passion to work on your project.

Connect with Loeffler