Nico Products Loading Dock Relocation
Details
Client
- The Lindgren Group
Location
Minneapolis, MN
Project Size
50,000 SF
Architect/Engineer
CNH Architects
Loeffler Role
General Contractor
Market
Special Projects
Creating Solutions for Complex Projects
Due to the expansion of I-35W, the loading docks at the Nico Products facility needed to be relocated to a different area of the building. Nico Products, a family-owned metal plating and finishing company, required that plant operations remain fully active throughout construction.
The relocation included site upgrades, exterior painting, and the transfer of critical plant operations such as steam boilers, electrical distribution panels, and production lines. Work was carefully sequenced in detailed phases to ensure the plant never experienced downtime.