Due to street reconfiguration in the area, the loading docks of the Nico facility were required to be relocated from one area of the builidng to another. This relocation required moving of crictical plant operations including steam boilers, electrical distribution panels and production lines. All work was done in detailed phases such that the operations of the plant were never shut down.